Dematec supports the transfer of the Riverland Water Project to SA Water
In December 2025, operations and maintenance of the Riverland Water Project (consisting of 10 water treatment plants and 1 wastewater treatment plant) was transferred from TRILITY to SA Water.
After more than 15 years supporting TRILITY with the electrical and control systems of these plants, Dematec Automation assisted both TRILITY and SA Water with this transition and will continue to provide SA Water with assistance, as the Riverland-based plants become further integrated into their operational systems.